| October 22 |
Energy Fuels
Letter to Montrose County Regarding State Licensing
Process |
| October 6 |
Site 1
Meteorological Data Finalized |
| September
25 |
Third Quarter 2009
Groundwater Monitoring Report
Appendix A
Well Sampling Field Sheets
Appendix B
Laboratory Analytical Sheets
Figure 1
|
| September
24 |
Site 1 Meteorological
Data Revised |
| September
16 |
Response to
Public Comments Received at two Montrose Board of
County Commissioner Meetings
2007 Colorado
Medical Society Resolution Opposing In-situ and
Open Pit Uranium Mining
|
| September 4 |
License
Application Schedule |
| August 31 |
Mine Operations
Plan
Figure 1.1
Colorado and Utah mine and exploration
properties
Figure 1.2
Principal uranium deposits
Figure 6.1
Potential sources of ore feed to the mill
|
| August 28 |
Mildos-Area
Assessment of Off-site Radiation Doses |
| August 28 |
Radiological
Exposure Pathways Report |
| August 27 |
Meteorology,
Air Quality and Climatology Report
Appendix A1 Site 1
and Site 2 Meteorological Data
Appendix A2 PM10 Data
Appendix A3
Radionuclide Data
Appendix A4 Audit and
Calibration Reports
Appendix A5 Air Quality
Performance Audits
Appendix A6
Meteorological and Air quality Performance
Audits
Appendix B Precipitation
Gauge Investigation
Appendix C Wind and
Atmospheric Stability Joint Frequency Tables
Appendix D Climate Data
Figures 1 -3
Figures 4-13
|
| August 24 |
Construction
Plan |
| August 19 |
Second Quarter 2009
Ambient Air Monitoring Report (Revised)
Appendix A
- Meteorological Data
Appendix B -
Particulate Matter Sampling Sheets
Appendix C -
PM10 Data
Appendix D -
Radionuclide Data (Revised)
Appendix E -
EFR Ambient Air Systems Calibration Report
Appendix F -
IML Calibration and Quality Assurance Audit
Report
(see
August 31, 2010 response to Air Pollution
Control Division for revision information)
|
| August 6 |
Colorado Historical Society
Letter #55427 |
| July 29 |
Baseline
Radiological Investigation Report
Figure 1.1
Figure 3.1
Figure 3.2
Figure 3.3
Figure 3.4
Figure 3.5
Figure 4.1
Figure 4.2
Figure 4.3
Figure 4.4
Figure 4.5
|
| July 21 |
Air Permit Application
with Air Pollution Emission Notice (APEN)
Section 1 -
Application to Construct and APEN forms
Section 2 - Process
Description
Section 3 - Figures
and Process Flow Diagrams
Section 4 - Emission
Calculations
Section 5 -
Regulatory Analysis
Section 6 - Support
Materials
Section 7 - Control
Device Malfunction Prevention and Abatement
Plans
Section 8 - Modeling
Analysis (Reserved)
|
| July 21 |
Facility Operating
Plan and Selected Mill Design Drawings |
| July 7 |
Hydrogeologic
Report
|
| June 10 |
Socioeconomic Baseline
for Proposed Pinon Ridge Uranium Mill |
| June 10 |
Second Quarter
2009 Groundwater Monitoring Report
Appendix A - Well Sampling Field Sheets
Appendix
B1 - Laboratory Analytical Results
Appendix
B2
Appendix
B3
Figure 1
- Monitoring and Production Well Map
|
| June 9 |
Geologic Report |
| June 5 |
First Quarter
2009 Groundwater Monitoring Report
Appendix A - Well Sampling Field Sheets
Appendix
B1 - Laboratory Analytical Results
Appendix
B2
Appendix
B3
Appendix
B4
Figure 1
- Monitoring and Production Well Map
|
| May 28 |
2008 Surface
Water Quality Summary
Appendix
A - Surface Water Sampling Field Sheets
Appendix B1
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Appendix B2
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Appendix B3
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Appendix B4
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Appendix B5
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Appendix B6
- Laboratory Analytical Results, QA/QC Date,
Chain-of-Custody
Figure -
Surface Water Sampler Locations
|
| March 27 |
Baseline Hydrology
Modeling Report
Appendix A
- Runoff Curve Numbers
Appendix B -
Unit Hydrographs
Appendix C
NOAA Precipitation Data
Appendix D -
HEC-1 Model 10 and 100 Year Events
Appendix E -
HEC-1 Model 1000 Year Event
Figure - Site
Location Map and Drainage Basins
|
| March 12 |
Fourth Quarter
2008 Groundwater Monitoring Report
Appendix A -
Daily Field Report and Well Sampling Field
Sheets
Appendix B -
Laboratory Analytical Results, QA / QC Data, and
Chain-of-custody
|
| March 10 |
Fourth
Quarter 2008 Ambient Air Monitoring Report
Appendix A
- Meteorological Data
Appendix B -
PM10 Data
Appendix C -
Radionuclide Data
Appendix D -
Calibration Report
Appendix E -
Audit Report
Appendix F -
Particulate Matter Sampling Sheets
Figures
|
| February 27 |
Transmittal of Reports to Colorado Division of
Wildlife |
| February 17 |
Cover
Letter for Wildlife Survey, Vegetation Survey and
Screening of Raffinate Process Water Report |
| February 13 |
Site Drainage Analysis and Design Report
Appendix A - South Diversion Channel and Berm
Appendix B - West Stormwater Pond
Appendix C - East Stormwater Pond
Appendix D - Ore Pad Channel
Appendix E - Storm Sewer Network
Appendix F - Evaporation Pond Diversion Channels
Appendix G - Main Access Road Drainage
Site Grading Drainage and Access Road Design
|
| February 13 |
Tailing Cell
Closure Design Report
Figures
Appendix A -
Tailing Cell Closure Criteria
Appendix B - Radon Barrier Cover Thickness
Design
Appendix C - Design Analysis for Erosion
Protection Cover
Appendix D - Numerical Analysis of Water
Percolation Through the Cover Cap
Drainage
Plans
|
| February 12 |
Wildlife Survey
Figure 1 - Site Location
Figure 2 - Level III Ecoregions of the Four
Corners area
Figure 3 - Level IV Ecoregions of Southwest
Colorado
Figure 4 - Night
Observation and Bird Survey Points
Appendix A - Point
Count Survey Results
Appendix B - Point
Count Bird Census Forms
|
| February 9 |
Vegetation Survey
Figure 1 - Site
Location
Figure 2 - Level
III Ecoregions of the Four Corners Area
Figure 3 - Level
IV Ecoregions of Southwestern Colorado
Figure 4 - Ecotone
Map
Figure 5 - Habitat
Assessment Points
Figure 6 - Arroyo
Location Map
Appendix A -
Habitat Observations
Appendix B -
Habitat Assessment Forms
Appendix C - Photographs
|
| February 3 |
Third Quarter
2008 Ambient Air Monitoring Report
(corrected)
Appendix A
- Meteorological Data
Appendix B -
PM10 Data
Appendix C -
Radionuclide Data
Appendix D -
Calibration Report
Appendix E -
Audit Report
Appendix F -
Particulate Matter Sampling Sheets
|
| January 30 |
Second
Quarter 2008 Ambient Air Monitoring Report
(corrected)
Appendix A
- Data Collection Summary
Appendix B -
Meteorological Data
Appendix C -
PM10 Data
Appendix D -
Radionuclide Data
Appendix E -
Audit Report
Appendix F -
Calibration Report
Appendix G -
Particulate Matter Sampling Sheets
|