| December 18 |
Surface Water Sampling Work Plan - revision 3 |
| November 14 |
Third Quarter 2008 Groundwater Monitoring Report
Appendix A -
Daily Field Reports
Appendix B -
Lithologic Log and Well Construction Details for
MW-8B and MW-9
Appendix C -
Monitoring and Production Well Construction
Reports
Appendix D -
Well Development and Sampling Field Sheets
Appendix E - Monitoring Well, Production Well,
and Exploratory Boring Laboratory Analytical
Results, QA/QC, and Chain-of-Custody
|
| November 6 |
Second Quarter 2008 Groundwater Monitoring Report
Appendix A -
Daily Field Reports
Appendix B -
Lithologic Logs for MW-7 and MW-8A and Well
Construction Details for MW-7
Appendix C -
Well Development and Sampling Field Sheets
Appendix D - Lithologic Logs for the Exploratory
Borings
Appendix E -
Monitoring Well Laboratory Analytical Results,
QA/QC, and Chain-of-custody
|
| November 4 |
Ecological Screening of Raffinate Process Water |
| October 31 |
Geotechnical Design Recommendations
Appendix A -
Vicinity Map, Boring Location Plan, Mill Pad
Drainage and Grading Plan
Appendix B - Logs of Exploratory Borings
Available on CD - see
instructions above
Appendix C - Laboratory Test Results
Available on CD
Appendix D - Augered Pressure Grouted Piles
Allowable Capacity Available on CD
Appendix E - Design Ground Motions
Available on CD
|
| October 10 |
Roadway Pavement Design Recommendations
Appendix A -
Vicinity Map, Locations of Borings and Test
Pits, Pavement Design
Appendix B - Logs of Pavement Borings and Pits
Available on CD - see instructions above
Appendix C - Laboratory Test Results
Available on CD
Appendix D - Roadway Thickness Calculations and
Design Charts Available on CD
|
| October 9 |
Advance Copies of Design Reports |
| September |
Phase 3 Long-term Pumping Test Data Report
Appendix A - Phase 1 Hydrogeological Testing Technical Memorandum
Appendix B - Phase 2 Hydrogeological Testing Technical Memorandum
Appendix C - Well Logs
Appendix D - AQTESOLV Analyses
Figures
|
| September
24 |
Department Presentation at Uranium Recovery Workshop, Montrose,
Colorado |
| September 8 |
License Application Schedule |
| August 27 |
Baseline Survey of Radionuclides in Animal Tissues
at the Proposed Pinon Ridge Millsite |
| August 19 |
Department air
permit requirements
regarding Special Use Permit Application |
| August 14 |
Department Letter to
Montrose County regarding Special Use Permit
Application |
| July 22 |
Special Use Permit Application
Figures
Appendix A - Regulatory Requirements
Appendix B - Special Use Criteria
Appendix C - Legal Description and Property Ownership
Appendix D - Mill Components
Appendix E - Environmental Protection Measures
Appendix F - Closure and Reclamation Measures
Appendix G - Radiation and Worker/Public Safety
Appendix H - Full Size Drawings
|
| July 18 |
Ambient
Air Monitoring Plan
Figure 1 - included in Section 8.2
Figure 2 - Topographic
Map Figure 3 - Site Location
Appendix A - Site 1
Photographs Appendix B - Site 2
Photographs Appendix C - Site 3
Photographs Appendix D - Site 4
Photographs Appendix E - Site 5
Photographs Appendix F - Laboratory
Calibration QAPPs Appendix G- Tisch
Brushless VFC High Volume Air Sampler SOP
Appendix H - PM10 Federal
Reference Method (FRM) Sampler SOP
Appendix I -
Meteorological Station SOP
Appendix J - Rain / Snow
Gauge SOP Appendix K - Evaporation
Gauge SOP Appendix L - Auditor SOP
|
| July 9 |
Additional actions to characterize groundwater
at the Pinon Ridge Uranium Mill site |
| June 17 |
Adsorption Field Septic System Design |