Hazardous Materials and Waste Management Division
Radiation Program
Energy Fuels Pinon Ridge Project Geotechnical Designs
Files available on CD
- some of these files are very large. If you have
problems downloading these files or the files are not available
online, you may request
a copy on CD by contacting Phil Egidi at 970-248-7162.
Transmittal Letter
October 9, 2008
Phase 2 Geotechnical Field and Laboratory Test
Program
Report
Tables
Figures
Drawings
Appendix A Workplan for Phase 2 Field
Exploration Program
Appendix B Geotechnical Field Exploration
Program Results
Appendix C Laboratory Test Results
Appendix D Product Data Sheets
Appendix E Liquefaction Evaluation
|
Tailings Cell Design Report
Report
Tables
Figures
Drawings
Appendix A Alternative Liner Flow Comparison
Appendix B GCL Compatibility Testing
Appendix C Anchor Trench Evaluation
Appendix D Tailings Underdrain System Design
Appendix E Leak Collection and Recovery System
Design
Appendix F Action Leakage Rates
Appendix G Chemical Resistance Information
Appendix H Stability Evaluation
Appendix I Tailings Cell Water Balance
Appendix J Tailings Deposition Modeling
Appendix K Site-wide Mass Balance
|
Evaporation Pond Design Report
Report
Tables and Figures
Drawings
Appendix A Water Balance Evaluation
Appendix B Action Leakage Rate
Appendix C Water Fowl Protection System
Appendix D Chemical Resistance Information
Appendix E Leak Collection and Recovery System
Design
|
Ore Stockpile Pad Design Report
Report
Drawings
Appendix A Cushion Material Thickness
Calculation
Appendix B East Stormwater Collection Pond
Sizing Calculation
Appendix C Stability Evaluation
Appendix D Structural Concrete Design
Calculations
|
Technical Specifications
Report
|
|