Hazardous Materials and Waste Management Division
Pueblo Chemical Depot
Chemical Demilitarization Program
Selected Documents from the Administrative Record
All documents will be available for public review
at the Hazardous Materials and Waste
Management Division Records Center during normal business hours.
In addition, Information Repositories
are located throughout Pueblo County, and will contain current
working documents, figures and drawings. Information
Repositories are not intended to contain the complete Administrative
Record; rather Information Repositories are intended to make review
of current work documents easily accessible to the public.
RCRA Research, Development and Demonstration (RD&D) Draft Permit Modification
Pueblo Chemical
Agent - Destruction Pilot Plant Public Notification - Draft Class 3 Permit
Modification - Brine Concentrator Feed Tanks
Fact Sheet - Draft Class 3 Permit
Modification - Brine Concentrator Feed Tanks March 29,
2009
RCRA Research, Development and Demonstration (RD&D) Permit -
Phase III Modification; October 17, 2008
Fact Sheet - Issuance
of Draft Permit with Phase III Permit Modification June
25, 2008
Part
1 - Standard Permit Conditions
Part 2 - General Facility Conditions
Part 3 - Storage
and Treatment in Tanks
Part 4 - Storage
and Treatment in Containment Buildings
Part 5 - Reserved
Part 6 and Attachments A, B, and C - Corrective Action for Solid
Waste Management Units; Facility Description, Site Maps and Figures;
Phase I Construction Plan; Phase II Construction Plan
Appendix 1 -
Laboratory Quality Assurance Program Plan
Appendix 3 -
Laboratory Analysis and Monitoring Plan
For a complete copy of the Permit, including diagrams, email the Division at
comments.hmwmd@state.co.us . Please add "Jeannine
Natterman / Pueblo" in the subject line, and include a physical
address so that a compact disk (CD) can be mailed to you.
Response to Comments to Draft Phase III Permit
Approval Letter
Part I and
Drawings
Parts
Introduction, II, III, VI and Attachment A
Part IV
Subpart CC
Frequently Asked Questions
Health Risk Assessment
June 2008 Comments to the
Centers for Disease Control on the Proposed Modifications to the
Mustard Toxicological Standards
Comments pages 3-5
Comments pages 6-8
Comments page 9
Comments pages 10-12
Letter of Approval of the
Draft Multi-pathway Health Risk Assessment Report for Pueblo
Chemical Agent - Destruction Pilot Plant Facility
Oct 2007 Draft Multiple Pathway Health Risk Assessment
(MPHRA) Report
Executive Summary
Index
Chapter 1 - Introduction
Chapter 2 - Facility Characterization
Chapter 3a - Air Dispersion and Deposition Modeling
Chapter 3b
Chapter 3c
Chapter 3d
Chapter 3e
Chapter 4 - Selection of Exposure Scenarios
Chapter 5 - Quantifying Media Concentrations and Exposures
Chapter 6 - Toxicity Assessment
Chapter 7 - Risk Characterization
Chapter 8 - Uncertainty Analysis of Risk Characterization
References
Appendix A - COPC Selection Process
Appendix B - PCAPP Emissions Estimates
Appendix C - Discussion of Meteorological Data Pre-Processing
Appendix D - Formulae and Detailed Procedures for Estimating Media Concentrations and Quantifying Exposure and Risk
Appendix E - Example Calculations Vinyl Chloride, Adult Farmer Exposure Scenario
Appendix F - Summary of Data Sources for Parameters Used in the Multiple Pathway Health Risk Assessment
Appendix G - Summary Tables of Calculated Media Concentrations, Exposure Estimates and Risk
Appendix H - Output Tables from the Chronic Risk Calculator Spreadsheets
Appendix I - Output Tables from the Acute Risk Calculator Spreadsheets
Aug 2004 Human Health Risk Assessment Fact Sheet
Health Risk Assessment Flow Chart
Public Participation Plan
July 2005 Colorado
Department of Public Health and Environment Public Participation
Plan
Miscellaneous
Inspection Close-out for PCAPP
Phase I Construction Activities - February 19, 2008
|