Colorado.gov: Colorado's Official Website

 

"" Live Help  |  

Colorado Department of Public Health and Environment

Division Home

Cotter Mill Home

Cotter Area Maps:

Topographic

Aerial

Street

Cotter Documents:

2012

2011

2010  (on CD)

2009  (on CD)

2008  (on CD)

2007  (on CD)

2006  (on CD)

2005  (on CD)

2004  (on CD)

2003  (on CD)

2002  (on CD)

Hazardous Materials and Waste Management Division
Cotter Mill Correspondence

2012 Documents

Cotter Corporation Cañon City Uranium Mill documents for public review:  2012 reports, correspondence, and other documents regarding radioactive materials acceptance and processing are listed below.


April
April 16 Letter from Cotter: Semiannual Performance Objective Report - Corrected Radon Section
March
March 28 Letter to Cotter: Work Pause
March 15 Letter to Cotter: Department Response to 4th Quarter 2011 Water Monitoring Report
March 2 Letter from Cotter: Final Construction Report for Lincoln Park Groundwater Monitoring Wells

Appendix A Boring Logs and Core Photographs
Appendix B Technical Memorandum and Drilling Photographs
Appendix C WS-51 Notice of Intent to Construct Monitoring Holes
Appendix C GWS-46 Water Well Permit Application
Appendix C GWS-31 Well Construction and Test Report

February
February 29 Letter from Cotter: Semiannual Performance Objective Report

Semiannual Performance Objective Report - Corrected Radon Section  April 2012

February 29 Letter from Cotter: 2011 Semiannual Effluent Report
February 27 Letter from Cotter: Demolition Reports

Solvent Extraction Building
Product Building
Surety Offset Summary

February 21 Letter from Cotter: Sampling Frequency Reduction for Dam to Ditch Area Monitor Locations
February 21 4th Quarter 2011 Water Monitoring Report
Data                  Analysis
February 20 Letter from Cotter: Notice of Submission of Asbestos Abatement Notification and Permit Application and Regulation No. 8, Part B. Variance Requests (2) for the Old Metallurgical Laboratory Building and Cooling Tower
February 17 Letter from Cotter: New Evaporation Pond and Water Management Alternatives
February 10

Letter from Cotter:  Dam to Ditch Area (“006 AREA”) Pilot Study Design Model

Figures 2-1 through 3-4

Figures 4-1 through 5-5

February 2 Letter from Cotter: Settlement Agreement and Amendment to Remedial Action Plan - Completion of Installation of New Lincoln Park Groundwater Monitoring Wells
January
January 31 Letter from Cotter: Request to Terminate Radioactive Materials License Colo 369-01
January 12 Settlement Agreement and Amendment to Remedial Action Plan
January 9 Letter from Cotter: Onsite Soil Excavation and Groundwater Characterization Process Plan
January 9 Letter from Cotter: Assessment of Proposed Changes to Soil Cleanup Standards and Implications for the Canon City Milling Facility and Surrounding Environs
January 5 Letter from Cotter: Soil Cleanup Methodology
January 5 Letter from Cotter: Groundwater Characterization Plan